Grow Delivery toward E2
2.3 today vs 3 expected at Engineer. Owns features from spec to release; estimates within ~25%.
- →Own a feature end to end, including the rollout plan
- →Track estimates vs. actuals for one cycle
Platform · Internal APIs
E1 Associate Engineer · reports to Dana Whitfield · 1.3 yrs tenure
What to do next
2.3 today vs 3 expected at Engineer. Owns features from spec to release; estimates within ~25%.
2.5 today vs 3 expected at Engineer. Designs small components cleanly; leaves code better than found.
Blended score · H2 2026
Blend: manager 50%, peers 30%, self 20%.
Self vs peers vs manager
9-box history
Outcomes · H2 2026
Internal API consumers aren't surprised by changes
on trackBreaking changes shipped: 4 → 1 / 0 count · Craft
Written feedback
Manager · Dana Whitfield
Tomás stands out for how they work with others — clear, generous and easy to align with. The biggest growth lever this cycle is framing work around the outcome, not the output — that's what separates the next level in Impact.
Peer · Lena Hoffmann
Working with Tomás is great for how they work with others — clear, generous and easy to align with. I'd love to see more framing work around the outcome, not the output.
Peer · Priya Raman
Working with Tomás is great for the quality of the technical work — designs are clean and hold up under load. I'd love to see more framing work around the outcome, not the output.
Self · Self review
I'm proudest of the quality of my technical work. Next half I want to focus on framing work around the outcome, not the output.
1 received
“Tomás asked the question nobody else would in the API review and saved us a breaking change.”
Lena Hoffmann · Collaboration · Slack